You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di RPTRA Amiterdam Pulau Untung Jawa Rampung
....
photo Suparni - Beritajakarta.id

Retention Ponds Construction in Amiterdam RPTRA Completed

The Thousand Islands Water Resources (SDA) Sub-agency has completed the construction of retention ponds locally known as kolam olakan in Amiterdam RPTRA area, RT 02/03, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

These ponds will also help officers to do water suction

Thousand Islands SDA Sub-agency Head, Hendri said, the ponds were made in the size of 2.5 meters with 2 meters and 50 centimeters. They also completed with three drainage controls measuring 60 centimeters length with 90 centimeters width and 50 centimeters depth.

"Alhamdulillah, our job is done. The ponds have three drainage controls plus covers. They are painted with yellow and blue colors for a neater look," he expressed, Monday (11/29).

Three Retention Ponds Built in Block N Park Cipayung

According to him, it aimed to overcome tidal waves in RT 02/03, around Amiterdam RPTRA and futsal field, as well as to increase the capacity of the existing drainage controls and infiltration wells.

"These ponds will also help officers to do water suction," he stated.

Linked News
Popular News indeks
  1. Joint Personnel Control Green Lane in Petamburan

    access_time25-04-2024 remove_red_eye880 personBudhi Firmansyah Surapati
  2. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye701 personAnita Karyati
  3. Central Government Teams Up with Japan to Realize Jakarta with TOD Concept

    access_time25-04-2024 remove_red_eye590 personFolmer
  4. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye465 personTP Moan Simanjuntak
  5. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye386 personAldi Geri Lumban Tobing