You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di RPTRA Amiterdam Pulau Untung Jawa Rampung

Retention Ponds Construction in Amiterdam RPTRA Completed

The Thousand Islands Water Resources (SDA) Sub-agency has completed the construction of retention ponds locally known as kolam olakan in Amiterdam RPTRA area, RT 02/03, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

These ponds will also help officers to do water suction

Thousand Islands SDA Sub-agency Head, Hendri said, the ponds were made in the size of 2.5 meters with 2 meters and 50 centimeters. They also completed with three drainage controls measuring 60 centimeters length with 90 centimeters width and 50 centimeters depth.

"Alhamdulillah, our job is done. The ponds have three drainage controls plus covers. They are painted with yellow and blue colors for a neater look," he expressed, Monday (11/29).

Three Retention Ponds Built in Block N Park Cipayung

According to him, it aimed to overcome tidal waves in RT 02/03, around Amiterdam RPTRA and futsal field, as well as to increase the capacity of the existing drainage controls and infiltration wells.

"These ponds will also help officers to do water suction," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye287 personAldi Geri Lumban Tobing